Gantt chart example (UEB uncontracted)
By:
Sign Up Now!
Already a Member? Log In
You must be logged into UK education collection to access this title.
Learn about membership options,
or view our freely available titles.
- Synopsis
- This page shows an example of a Gantt chart. There is a locator dot shown, which will be at the top left of the page when the image is the right way up. The short text descriptions down the left of the page relate to the row of boxes (or cells) opposite in the grid at the right. Each represents a step in the process of making a cake. Across the top of the page, the time is shown in intervals of five minutes. Below this is the grid in which some of the boxes are filled with textures. The textured cells in each row show how long each step will take and when it will start and end. So, for example, the third stage down Break open eggs, refers to the fourth cell to the right. By moving up to the scale at the top, you can see that this step will take five minutes to complete and will run from minute 15 to minute 20 in the cake-making process.
- Copyright:
- 2011
Book Details
- Book Quality:
- Publisher Quality
- Publisher:
- RNIB Bookshare
- Date of Addition:
- 08/04/16
- Copyrighted By:
- RNIB Bookshare
- Adult content:
- No
- Language:
- English
- Has Image Descriptions:
- No
- Categories:
- Nonfiction, Cooking, Food and Wine
- Grade Levels:
- Year 10 - 4th Form - KS4, Year 11 - 5th Form - KS4
- Submitted By:
- Bookshare Staff
- Usage Restrictions:
- This is a copyrighted book.